Forside
Kontakt

Brick Pattern - Instructions

The wall to be treated must be solid and strong. Absorbent surfaces should be primed with Beto binder thinned with water at a 1:3 ratio.
Before the Base Plaster dries, trowel the brick pattern on the surface.
After 24-48 hours, scrape off any loose particles on the wall and lime wash it with Skalcem CF2000. Remember to add Beto binder to the water mixture upon agitating CF2000 limewash.
When the wall has been limewashed, apply a thin layer of mortar using a slightly damp wall sponge.
The finished wall can be painted with paint and in colour at your desire after 2 days' curing.